The site
A daycare with an outdoor play area was going into an existing one-storey commercial building in Oakville. The area around it is commercial and light industrial. Highway 403/QEW is close by. There are automotive and fabrication shops nearby, rooftop equipment on the neighbouring buildings, and a CN corridor and yard in the area.
A daycare is a noise-sensitive use. Put one in an employment area and the Town, the Region and the railway all have questions, and the noise study has to answer them.
What we looked at
We assessed highway traffic noise at the building and the play area, plus the nearby shops and rooftop equipment as stationary sources. We screened the rail corridor and yard.
The study went to the Town of Oakville, to Halton Region's peer reviewer and to CN's acoustic peer reviewer, and we answered their comments in a response letter. The rail piece is the one that could have grown the scope. CN's reviewer agreed that a detailed rail corridor and yard noise analysis wasn't required, and neither was a ground-borne vibration assessment.
What we recommended
- A continuous acoustic barrier around the north outdoor play area. Continuous matters here. Sound gets through gaps, so we specified no gaps anywhere along it.
- Central air conditioning and sealed windows, so the rooms can stay closed.
- An acoustical inspection of the barrier once it's built. A barrier can look fine on the drawing and still go up with gaps or a lighter product, so we want to see it in place.
Our page on noise studies for Site Plan and rezoning covers the approvals side. For the stationary-source part of a study like this, see our industrial and environmental noise assessments.
Thinking about a daycare, school or other sensitive use near a highway, rail line or industrial area? Call us at (905) 707-5800 early, before the layout is locked in, or send us a request for a proposal.