The site

This was a residential development with two towers just off Yonge Street in Richmond Hill. The application was a Zoning By-law Amendment together with an Official Plan Amendment, reviewed by the City of Richmond Hill, and we did a detailed noise control study to support it.



Yonge Street traffic was the obvious source. There was also existing HVAC equipment on nearby buildings. And then there was the noise the development would make itself: a parking garage exhaust, rooftop mechanical units, a transformer and an emergency generator.


What we looked at

The traffic side was fairly standard for a tower on a busy arterial. We looked at what reaches the facades and what that means for windows and ventilation in the units.


The harder part was the building's own equipment. At rezoning, nobody has picked a generator or a rooftop unit yet. The mechanical design is still a concept. But a garage exhaust fan or a generator can be the loudest thing on the block for the neighbours, and for the residents upstairs. If those items get left until building permit with no target, the fix often ends up being whatever still fits in the space.


So we looked at each piece of equipment as a source in its own right, along with the neighbouring HVAC, and worked out what kind of control each one would likely need.


What we recommended

  • For one of the towers, the ventilation system designed so central air conditioning can be added later, plus noise warning clauses.
  • Acoustic lining or baffles in the garage exhaust, or a silencer.
  • Silencers, acoustic louvres or enclosures for selected rooftop units and the emergency generator.
  • A sound limit on the transformer, so the electrical designer has a number to buy to.
  • Final equipment noise controls confirmed before building permit, once the actual equipment is chosen.


Setting those limits at rezoning gives the mechanical and electrical engineers something concrete to design to later.


If you're heading into a rezoning or OPA in Richmond Hill or elsewhere in York Region, our page on noise studies for development approvals covers what the municipality usually asks for. Or give us a call at (905) 707-5800, or send your plans through our contact page and we'll have a look.

Aerial view of new townhouses beside vacant development land in Brampton, Ontario
By Omar Rahal • November 25, 2026
Feasibility or detailed noise study? When each one is needed for an Ontario OPA, rezoning, draft plan or Site Plan application, and what each covers.
QEW and Highway 403 near Trafalgar Road in Oakville, Ontario
November 17, 2026
Noise study for a daycare in an existing Oakville building near Highway 403/QEW. Reviewed by the Town, Halton Region and CN at Site Plan.